Yarn:
MC: Moda Dea Metro (94% Acrylic, 6% NylonNet wt. 100g . 3.52 oz114m . 124 yds) Color: 9340 Chocolate, 1 skein (to be used single stranded)
CC: Caron Simply Soft (6 oz (170 grams) 330 yards 100% acrylic)
Color: 068070 Dark Sage, 1 skein (to be used double stranded)
Gauge: 13stitches/4 inches (not essential to get exact guage) on size 10.5 needles
Additional materials: Stitch marker
Size J (6 mm) crochet hook (or enough matching fabric to make a 3.5 inch circle if you don’t want to crochet)
Stuffing
Extra yarn in light color to embroider face
Size: approximately 13 inches tall and 9 inches wide (at widest point)
Trunk:
Cast on 32 stitches with MC
Place marker to indicate beginning of round
Join to work in the round and work in stockinette stitch (knit every round) until piece measures 1.5 inches from cast on
Next round: (k2tog, k14) twice (30 stitches remain)
Continue in Stockinette until piece measures 3 inches from cast on
Next round: (k2tog, k13) twice (28 stitches remain)
Continue in stockinette until piece measures 4.5 inches from cast on.
Cut yarn, place first 14 stitches on a spare piece of yarn
Front of top:
(Worked back and forth)
Join 2 strands of CC
First row: k1, kfb, k4 with CC, join MC and k3 with it, k7 with CC
Note: In every row, you will be working the middle stitches in stockinette stitch (knit every right side row, purl every wrong side row) with the MC. use the intarsia method of twisting the two colors at the first color change, but if you want, you can strand the CC across the back for the second color change to avoid using another ball.
The CC stitches on either side of the column of MC will be worked in loop stitch.
(so when I say “work to end” I mean work CC in loop stitch to color change, work 3 MC stitches in stockinette, work CC in loop stitch until specified)
Right Side Increase Row 2: k1, kfb, work to last 2 stitches, kfb, k1
Wrong Side Increase Row: p1, pfb, work to last 2 stitches, pfb, p1
Do an increase row every row 8 times (until there are 31 stitches on the needles)
Continue knitting straight in loop stitch for CC and stockinette for MC column for 9 rows
Right Side Decrease Row: k1, ssk, work to last 3 stitches, k2tog, k1
Wrong Side Decrease Row: p1, p2tog, work to last 3 stitches, ssp, p1
Do a decrease row every right side row twice (27 stitches remain)
Note: At this point, stop working the stockinette column of MC and work only in loop stitch with the CC
Do a decrease row every row 6 times (15 stitches remain)
Bind off all stitches
Back of Top:
put the 14 stitches that were earlier held on a piece of yarn on to a needle to work them back and forth (like the front)
If you want the toy to be reversible, work exactly the same as front of top
If not, work the same as front of top, except without the MC stockinette column (entire thing will be in loop stitch with CC)
Bottom of Trunk:
Using MC and a size J crochet hook, crochet a circle with a diameter of about 3.25 inches
Or cut out a piece of matching fabric into a circle with a diameter of 3.5 inches (with seam allowance)
Finishing:
Using MC, embroider Branches onto the front of the top as in the diagram
Using lightly colored yarn, embroider the face onto the trunk as in the diagram
Sew bottom of trunk onto cast on end of trunk
Fill trunk with stuffing
Using mattress stitch and one strand of CC, sew up one side of top and around to the other side, leaving an opening to stuff
Fill top with stuffing
Sew top together the rest of the way.
Hug your tree.
│ knit on RS, purl on WS
Ω make loop (k1 but do not slip off of left needle, bring yarn to front, wrap around
thumb to make a loop, bringing yarn to the back, k the same stitch again, slip both stitches off of left needle onto right needle, pass first stitch over second stitch)
Abbreviations:
MC…..main color
CC…...contrast color
RS…..right side
WS…..wrong side
K…..knit
P…..purl
Kfb…..knit into the front and back of the same stitch
Pfb…..purl into the front and back of the same stitch
K2tog…..knit 2 together
Ssk…...slip one stitch knitwise, slip next stitch knitwise, return both to left needle and knit them together through the back loops
P2tog …..purl two stitches together
Ssp….. slip one stitch knitwise, slip next stitch knitwise, return both to left needle and purl them together through the back loops